Every food processing facility has had the conversation. A critical piece of equipment fails mid-shift. Maintenance digs out the part number. Checks the store. The part isn’t there. The supplier quotes three weeks for delivery. Production is down for the duration. Three weeks later, the part arrives, the equipment is repaired, and someone asks: how do we make sure this doesn’t happen again?
The answer is always the same: classify your spares, set appropriate stock levels for critical components, and manage the inventory systematically rather than reactively. The reasons facilities don’t do this aren’t complicated — it takes upfront effort, it requires a decision-making framework that most teams haven’t been given, and it’s easy to defer when production pressure is high. But the cost of not doing it tends to be significantly higher than the cost of doing it properly.
The Classification Framework That Changes Everything
The fundamental mistake in spare parts management is treating all inventory the same way. A bearing that can be sourced from a local industrial supplier within 24 hours doesn’t need to be stocked on-site at all times. A custom gearbox with a 14-week lead time from an overseas manufacturer is a completely different proposition. Applying the same stocking logic to both is what creates the combination of overstocked fast-moving consumables and dangerously understocked long-lead critical items that characterises most reactive spare parts strategies.
The VED classification framework — Vital, Essential, Desirable — provides the decision structure that most facilities are missing. Vital parts are those whose absence stops production entirely and for which no workaround exists. These must be stocked on-site at all times, at a level that accounts for lead time variability and usage rate. Essential parts allow a temporary workaround — perhaps running at reduced capacity or switching to a backup system — so a minimum buffer is appropriate but the stocking requirement is less absolute. Desirable parts have minimal production impact if they’re unavailable and are managed on demand without on-site stockholding.
The classification criterion is consequence, not cost or frequency of use. An expensive part used rarely might still be Vital if its failure would stop the line and its lead time is long. A cheap part used daily might be Desirable if its stockout has a simple workaround and local supply is immediate.
Setting Stock Levels That Reflect Real Risk
Once parts are classified, stock levels for Vital and Essential items need to be set using a methodology that accounts for lead time variability and usage rate rather than gut feel or historical order quantities.
The safety stock calculation for a Vital part is straightforward in principle: safety stock equals the product of average daily demand and the maximum reasonable lead time, less the product of average daily demand and average lead time. In practice, for parts with intermittent demand — used rarely but with severe consequences when needed — a simpler days-of-cover approach works well: hold a minimum of the lead time plus a buffer (typically 30 to 50% of lead time) as on-hand stock.
The reorder point calculation is equally important: average daily demand multiplied by lead time, plus safety stock. Setting a reorder point without accounting for lead time means you’ll trigger reorders too late when supplier lead times extend — and they always do at the worst possible moment.
Connecting Spare Parts to Your CMMS
The most significant productivity improvement in spare parts management comes from linking parts to the equipment they support and to the maintenance tasks that consume them. A CMMS configured to associate specific spare parts with specific equipment records and planned maintenance work orders transforms parts management from a reactive stock-check activity to a proactive supply chain function.
When a planned maintenance task is scheduled, the CMMS checks parts availability and flags shortfalls before the job window opens. When a part is consumed, the record is updated automatically. When a part is approaching reorder point, a purchase trigger is generated. This integration is what allows planned maintenance percentages to reach the 80 to 90% range that characterises well-managed food manufacturing facilities — because planned jobs can’t be completed if the parts aren’t there when they’re needed.
The investment in setting up this integration properly is typically recovered within the first significant reactive failure it prevents. That’s not a difficult business case to make.



Leave a Reply