The Hidden Costs of Managing Multiple Vendors on a Capital Project (and How EPCM Eliminates Them)

There’s an intuitive logic to managing multiple vendors on a capital project. If one supplier handles engineering, another handles fabrication, a third manages electrical installation, and a fourth handles controls commissioning, surely you have more competitive tension on price, more flexibility to swap underperforming suppliers, and more control over the outcome than if everything sits under one contract?

In practice, the opposite is usually true. The coordination burden that comes with managing multiple vendors on a complex capital project generates costs, delays, and risks that consistently exceed the savings achieved through competitive vendor selection. Understanding why this happens, and putting a number on the costs involved, is the most persuasive argument for the EPCM model.

The Scope Gap Problem

When project scope is divided between multiple vendors, gaps appear at the boundaries between each vendor’s scope. These gaps aren’t always visible in the contract documents, because each vendor writes their scope to describe what they’re responsible for rather than what they’re not. The gaps only become visible during execution, when something that needs to happen doesn’t clearly belong to any single vendor’s scope of work.

In Australian capital projects, scope gap resolution is almost always a variation order from at least one contractor. The variation cost isn’t just the work itself. It’s the project management time spent identifying the gap, negotiating responsibility, obtaining quotes, evaluating them, and administering the resulting variation. On a complex project with multiple vendors, this process repeats across dozens of scope interface points over the life of the project.

The Rework Cost of Disconnected Design and Construction

When engineering design is produced by a firm that isn’t managing construction, the design doesn’t always reflect the practical realities of how the work will be built. Clashes between structural, mechanical, and electrical elements that would have been caught in a coordinated EPCM design process become site problems during construction. Resolving them on site, under programme pressure, is significantly more expensive than resolving them during the design phase.

Industry data from Australian construction project audits consistently shows that rework costs on projects with disconnected design and construction typically run between 5 and 15 per cent of total project cost. On a $5 million capital project, that’s $250,000 to $750,000 in avoidable cost.

The Programme Cost of Communication Delays

When multiple vendors need to coordinate with each other, communication travels through the client rather than directly between the parties. A question from the fabrication contractor about a design detail goes to the client project manager, who raises it with the engineering firm, which responds to the project manager, who relays the answer to the fabrication contractor. In an integrated EPCM model, the same question is answered by the engineer talking directly to the fabricator in the same organisation.

The programme impact of these communication delays compounds across the life of a project. PFI’s project benchmarks consistently show that integrated EPCM delivery compresses overall project timelines by 12 to 25 per cent compared to equivalent projects managed across multiple disconnected vendors, primarily through elimination of this communication overhead.

The Management Overhead You’re Paying For Internally

The final hidden cost of multiple vendor management is the internal resource cost that doesn’t appear in any vendor’s invoice. The project manager, the engineering reviewer, the procurement administrator, and the contracts manager that the client deploys to coordinate multiple vendors represent a significant cost that’s often not fully accounted for in the project budget. Under an EPCM model, that coordination function sits with the EPCM firm, not the client, reducing the internal resource requirement significantly.

When all of these hidden costs are properly accounted for, the total cost of multiple vendor project delivery is consistently higher than EPCM alternatives, even before factoring in the reduced project risk and improved delivery performance that integrated project management produces.

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *

@Fd2X@HoSi10178
Button 3D Blue clean Button 3D Blue clean

Home

About

Button 3D Blue clean Button 3D Blue clean

Services

Join Us

Button 3D Blue clean

Industries

Button 3D Orange clean Button 3D Orange clean

Blog

Contact

@Fd2X@HoSi10158

Thanks for Joining Our Community!