Selecting an EPCM partner is a procurement decision with consequences that last for the entire life of the project and, in some cases, well beyond it. Unlike a equipment purchase where a poor decision can be corrected at the next procurement cycle, a poor EPCM partner selection is embedded in the project delivery structure from day one and is extremely difficult and expensive to change once work has begun. The evaluation process before contract award is where that risk is managed, and most pre-qualification processes don’t ask the right questions to surface the capability and cultural fit issues that determine whether the engagement will actually work.
Here are eight questions that do the work a good EPCM evaluation needs to do.
1. Who Specifically Will Be Working on This Project?
Capability statements describe the firm. The outcome of your project is determined by the specific people assigned to it. Ask for the CVs and project histories of the project manager, lead engineer, procurement manager, and site superintendent who would be assigned to your project. A strong firm with a weak project team assigned to your job is a weak project outcome.
2. What Is Your Current Workload and How Will This Project Be Resourced?
An EPCM firm that’s at capacity when they win your project will deliver it with whatever resources are available, not necessarily the right ones. Ask directly what their current project commitments are and how they plan to resource your project without compromising existing client commitments.
3. Show Me Three Projects of Similar Scope and Complexity. What Were the Schedule and Cost Outcomes?
Past performance data is the most reliable predictor of future performance. Ask for schedule performance index and cost performance index data from comparable completed projects. A firm that can’t provide this data either doesn’t track it, which tells you something about their project management discipline, or the data isn’t favourable, which tells you something more directly useful.
4. How Do You Handle Scope Changes Once the Project Is Underway?
Every significant capital project experiences scope changes. The question is whether the EPCM firm has a structured change management process that keeps changes visible, costed, and approved before work proceeds, or whether scope changes are managed informally and the cost impact surfaces at project completion. Ask to see their change management procedure and an example of a change register from a recent project.
5. What Portion of Your Engineering Work Is Done In-House Versus Subcontracted?
As discussed elsewhere, this question quickly distinguishes genuine EPCM capability from project management with subcontracted engineering. There’s nothing inherently wrong with subcontracting specialist engineering disciplines, but it needs to be transparent, and the EPCM firm’s ability to technically manage subcontracted engineering work is a specific capability that needs to be assessed.
6. How Do You Manage Safety on Site and What Is Your Recordable Incident Rate?
In Australian industrial capital projects, safety performance is both a regulatory requirement and a genuine indicator of operational discipline. Ask for the firm’s Total Recordable Incident Rate (TRIR) and Lost Time Injury Frequency Rate (LTIFR) for the past three years. Ask how their site safety management system works in practice, not just what the documentation says.
7. What Does Your Commissioning and Handover Process Look Like?
The commissioning and handover phase is where many EPCM engagements lose the gains made during engineering and construction. Ask specifically how they manage the transition from construction complete to operational handover, what documentation they deliver at handover, and what post-handover support is available.
8. What Would You Do Differently If You Were Doing This Project Again?
This question is the best test of intellectual honesty and genuine experience in an EPCM evaluation. A firm that answers with a polished description of everything they do right is presenting. A firm that describes a specific challenge on a recent project and what they learned from it is demonstrating genuine experience and the kind of honest self-assessment that produces improving performance across projects. PFI, Products For Industry, welcomes this question and has specific, honest answers from projects across Queensland and broader Australia.