Safety performance on a grid-scale battery energy storage project is measured in more than incident statistics. It reflects the depth of the safety management system applied across HV electrical work, confined space entry, excavation and a large, multi-employer workforce operating on a live construction site over an extended period.
The scale of the challenge
Across two stages of delivery on a grid-scale BESS in Queensland, Powering Future Industries (PFi) accumulated 112,000 onsite man-hours, with a peak workforce of 120 personnel on site during critical periods. That workforce included PFi’s own trades alongside multiple subcontractor crews, all working under a single safety system.
What underpinned that performance
- An ISO 45001-certified Occupational Health and Safety Management System applied consistently across the project
- Documented Safe Work Method Statements for all high-risk construction activities
- Permit-to-work controls for HV electrical work, confined space entry and excavation
- Daily pre-start briefings across the full workforce
- Integrated HSE coverage extending to PFi’s direct labour and all subcontractor labour on site
Why this matters for project owners
Grid-scale energy infrastructure projects carry genuine high-risk exposure, from HV electrical work through to large excavation programmes. A contractor’s safety system needs to be capable of managing that risk consistently across a large, multi-employer workforce, not just on paper but in daily practice on site.
A track record worth scrutinising
For project owners and head contractors evaluating delivery partners for their next battery storage or renewable energy project, a documented safety track record at this scale, under a certified management system, is one of the clearest indicators of operational maturity available.